Bringing Down – Day 3

As cleaning and deconstruction continued, damage to the existing structure became apparent. In particular, the connection points of the circa 50-year-old addition revealed significant weaknesses in the timber construction. Before the roof truss can be completed, these areas must be repaired and also solved better than before.